Mercedes M-Class W163

since 1997 of release

Repair and car operation



Mercedes W163
+ Mercedes-Benz Cars of a class M (W163)
+ Governing bodies and receptions of safe operation
+ Current leaving and service
- Engine
   Check of kompressionny pressure in cylinders
   Engine check by means of the vacuum gage
   Replacement of a belt of a drive of auxiliary units and elements of the mechanism of its tension
   + Petrol models
   - Diesel models
      Removal and engine installation
      Removal and installation of covers of a drive of GRM
      Replacement of a gas-distributing chain
      Removal and installation of components of a drive of GRM
      Installation of base provision of camshafts
      Verification of the base provision of a balancing shaft (only series 628 engines)
      Removal and installation of GRM components
      Removal and head installation (ok) cylinders
      Removal and installation of the electromotor of shutdown of inlet port (series 612 engine)
      Removal and installation of a final collector
      Replacement of a forward epiploon of a cranked shaft
      Removal and installation of a back face cover, replacement of a back epiploon of a cranked shaft
      Removal and installation of a damper krutilny fluctuations/pulley of a driving belt
      Removal and flywheel installation / driving disk
      Removal and installation of support of a suspension bracket of the power unit
      Service of system of greasing
+ Systems of cooling, heating and air conditioner
+ the Power supply system and production of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Avtomaticheckaya transmission
+ Transmission line
+ Brake and auxiliary systems
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment



Removal and installation of the electromotor of shutdown of inlet port (series 612 engine)

Details of installation of the electromotor of shutdown of inlet port of the engine of a series 612


 PERFORMANCE ORDER

  1. Details of installation of the electromotor of shutdown of inlet port on engines of a series 612 are shown on an illustration which all references meeting in the text concern.
  2. Remove the air distributor.
  3. On models from RKPP remove the left forward wheel.
  4. On models from RKPP remove a loker of protection of a wheel arch.
  5. Turn out bolts (1).
  6. Release a clamp and separate a strut (3) from a spherical head (2).
  7. Disunite the contact socket (4) electroconductings of the electromotor (М55).
  8. Remove assembly of the electromotor (М55) from the pipeline of distribution of air (5).
  9. Installation is made upside-down.
  10. In summary make cleaning of memory of the module of onboard self-diagnostics (see. Head of System of electric equipment of the engine).