Mercedes M-Class W163

since 1997 of release

Repair and car operation



Mercedes W163
+ Mercedes-Benz Cars of a class M (W163)
+ Governing bodies and receptions of safe operation
+ Current leaving and service
+ Engine
+ Systems of cooling, heating and air conditioner
+ the Power supply system and production of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Avtomaticheckaya transmission
- Transmission line
   + Coupling
   + Driveshafts
   + Power shafts
   - Transfer case and differentials
      Removal and installation of the module of management of a transfer case
      Removal and installation of a transfer case
      Replacement of an epiploon of an entrance shaft of a transfer case
      Replacement of an epiploon of a target flange of the back driveshaft
      Replacement of an epiploon of a forward target shaft
      Removal and installation of the servomotor of switching of modes of a transfer case
      Removal and installation of a chain drive of a transfer case
      Removal and installation of a forward target shaft of a transfer case
      Removal and installation of assembly of a planetary reducer of interaxal differential of a transfer case
      Removal and installation of assembly of bearing assembly of a transfer case
      Removal and installation of the oil pump of a transfer case
      Removal and installation of the mechanism of switching of a transfer case
      Removal and installation of a reduktsionny gear wheel of a transfer case
      Replacement of lateral epiploons of differentials
      Replacement of epiploons of leading gear wheels of differentials
      Removal and installation of differentials
+ Brake and auxiliary systems
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment



Removal and installation of assembly of a planetary reducer of interaxal differential of a transfer case

Replacement of an epiploon of a forward target shaft

1 — the Transfer case
13 — Asterisks of chain transfer
13а — the Driving chain
14 — the Lock ring
15 — the Ball bearing

16 — the Forward target shaft
17 — the Epiploon
18 — the Planetary reducer
19 — the Back target shaft


 PERFORMANCE ORDER

  1. Details of installation of a planetary reducer are shown on an illustration which all references meeting in the text concern.
  2. Remove assembly of a chain drive (13 and 13а) (see. Section Replacement of an epiploon of a forward target shaft).
  3. Having pulled up, liberate from planetary assembly (18) back target shaft (19).
  4. Having pulled also up, take from a case of a transfer case assembly of a planetary reducer (18).
  5. Installation is made upside-down.
  6. In summary check a transfer case on existence of signs of development of leaks.