Mercedes M-Class W163

since 1997 of release

Repair and car operation



Mercedes W163
+ Mercedes-Benz Cars of a class M (W163)
+ Governing bodies and receptions of safe operation
+ Current leaving and service
+ Engine
+ Systems of cooling, heating and air conditioner
- Power supply system and production of the fulfilled gases
   + Power supply system of petrol engines
   - Power supply system of diesel engines
      General information
      Checks of system of injection of fuel
      Service of components of an inlet air path
      Service of components of a drive of a butterfly valve
      Oporozhneniye of a fuel tank
      Removal and installation of the sensor of a stock of fuel
      Air removal from a contour of low pressure of a fuel path, - on an example of the engine of a series 612
      Removal and installation of the preliminary fuel pump
      Removal and installation of the fuel pump of a high pressure (TNVD)
      Removal and installation of the fuel distributive highway and nozzles
      Removal and installation of the sensor of pressure in the fuel highway
      Removal and installation of the electric locking valve, - models 163.113
      Removal and installation of the valve regulator of pressure of fuel
      Removal and installation of klapanny assembly on models 163.128
      Removal and installation of a cooler of fuel on models 163.113
      Removal and installation of the module of management by fuel injection
      Removal and installation of a fuel tank
   + Systems of release and decrease in toxicity of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Avtomaticheckaya transmission
+ Transmission line
+ Brake and auxiliary systems
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment



Removal and installation of a cooler of fuel on models 163.113

Details of installation of a cooler of fuel on models 163.113 (the series 612 engine)


 PERFORMANCE ORDER

  1. Details of installation of a cooler of fuel on models 163.113 (the series 612 engine) are shown on an illustration which all references meeting in the text concern.
  2. Open a cowl and fix it in vertical situation.
  3. Remove panels of furnish of a cover of a head of cylinders.
  4. Merge cooling liquid from a radiator.
  5. Disconnect and закупорьте a cap a hose of supply of fuel (1) to a fuel (5) cooler.
  6. Disconnect from a cooler a hose of removal of fuel (2), - at once it закупорьте.
  7. Disconnect a hose of removal of cooling liquid (4) from a thermostat casing.
  8. Turn out fixing bolts (7) and remove assembly of a cooler of fuel (5), having disconnected from it a hose of supply of cooling liquid (3).
  9. Installation is made upside-down.
  10. In summary start the engine and check on existence of signs of development of leaks components of power supply systems and engine cooling.